Identifikasi Waste pada Proyek Jalan Tol Kayu Agung-Palembang Betung dengan Menggunakan Lean Construction
DOI:
https://doi.org/10.28926/briliant.v11i2.2348Keywords:
Lean Construction, Waste, Project EfficiencyAbstract
Development in Indonesia continues to increase in line with growing community needs. In South Sumatra Province, one of the projects currently underway is the Kayu Agung – Palembang – Betung Toll Road. This study is expected to contribute to the development of Lean Construction methodology in Indonesia and provide practical recommendations for other infrastructure projects. The application of Lean principles in this project has significant potential to reduce waste and improve efficiency. The results of the study show that out of eight categories of waste, seven types of waste were identified. The two most dominant were Defects (24.14%) and Waiting (20.69%). The dominance of Defects indicates weaknesses in quality control, which leads to rework, cost overruns, and reduced resource efficiency. Meanwhile, the high level of Waiting illustrates a lack of synchronization in the workflow due to delays in material supply, ineffective coordination, and slow decision-making. The combination of these two factors has a direct impact on decreased productivity, schedule delays, and increased budgets. Therefore, this study emphasizes the need for stricter quality control and time management strategies through the application of Lean Construction principles.
References
A llo, R. I. G., & Bhaskara, A. (2022). Analisis Waste Material Dengan Penerapan Lean Construction. Jurnal Teknik Sipil, 18(2), 343–355.
Alrizal, F. F., Listyaningsih, D., & Saputra, I. G. (2023). Analisis Perbandingan Biaya, Waktu, Dan Dampak Lingkungan Pada Pekerjaan Lapis Pondasi Atas menggunakan Material Recycle Dan Cut And Fill (Studi Kasus: Proyek Pembangunan Jalur Lintas Selatan Tulung Agung -trenggalek). PADURAKSA: Jurnal Teknik Sipil Universitas Warmadewa, 12(2), 195–202. https://doi.org/10.22225/pd.12.2.6698.195-202
Berawi, M. A., Sari, M., Miraj, P., Mardiansyah, Saroji, G., & Susantono, B. (2023). Lean Construction Practice On Toll Road Project Improvement A Case Study In Developing Country. Civil Engineering Journal (Iran), 9(12), 3186–3201. https://doi.org/10.28991/CEJ-2023-09-12-016
Rahmawati, D., Firmawan, F., Auliya, M. B., & Martiano, D. (2021). Analisis dan Evaluasi Sisa Material Konstruksi Menggunakan FTA ( Fault Tree Analysis) Studi Kasus: Proyek Pembangunan Gedung ICU RSUD Limpung Kabupaten Batang. 5(2), 115–122. http://journals.usm.ac.id/index.php/jprt/index
Chasan Mudzakir, A., Setiawan, A., Agung Wibowo, M., & Radian Khasani, R. (2017). Evaluasi Waste dan Implementasi Lean Construction (Studi Kasus : Proyek Pembangunan Gedung Serbaguna Taruna Politeknik Ilmu Pelayaran Semarang). Jurnal Karya Teknik Sipil, 6(2), 145–158. http://ejournal-s1.undip.ac.id/index.php/jkts
Fahmi Firdaus Alrizal, Diah Listyaningsih, & Ihsan Galang Saputra. (2023). Analisis perbandingan biaya, waktu, dan dampak lingkungan pada pekerjaan lapis pondasi atas menggunakan material recycle dan cut and fill (studi kasus: proyek pembangunan jalur lintas selatan Tulungagung -Trenggalek). PADURAKSA: Jurnal Teknik Sipil Universitas Warmadewa, 12(2), 195–202. https://doi.org/10.22225/pd.12.2.6698.195-202
Fazri, I., & Rahmawati, Y. (2024). Kajian Penerapan Konsep Konstruksi Ramping Di Palembang. Arsir, 8(1), 64–77. https://doi.org/10.32502/arsir.v8i1.122
Fitriani, N., Nuswantoro, W., & Purwanto, A. (2025). Identifikasi Waste pada Proyek Konstruksi dengan Penerapan Metode Lean Project Management (Studi Kasus: Penataan Kawasan Jembatan Kahayan Provinsi Kalimantan Tengah). Jurnal Teknik Sipil, 17(1), 197–203.
Hapito, Anwardi, & Hamdy, M. I. (2020). Identifikasi Waste Proyek Konstruksi Jalan dengan Menggunakan Metode Lean Project Management. Jurnal Teknik Industri: Jurnal Hasil Penelitian Dan Karya Ilmiah Dalam Bidang Teknik Industri, 5(2), 115. https://doi.org/10.24014/jti.v5i2.8999
Indriani, S. N., Anisah, & Wirdianto, A. (2025). Analisis Varianc e pada Penerapan Lean Construction Terhadap Waktu Produksi Proyek EPC ( Studi Kasus Proyek Mogas PT XYZ ). 1(5), 3095–3113.
Islami, F. N., Suprapto, B., & Aasniari. (2025). Analisis Waste Material Pembesian Struktur Bawah Menggunakan Metode Konvensional Dan Software Cut Optimization Pro Pada Proyek Jembatan Utama Akses Tol Bandara Dhoho Kediri Sta 6 +655,06. 15(2), 230–240.
Julisa, Mulyani, E., & M.Nuh, S. (2019). Identifikasi Dan Evaluasi Lean Contruction Pada Proyek Konstruksi Pembangunan Jalan Kakap - Punggur. JeLAST : Jurnal PWK, Laut, Sipil, Tambang, 6(1), 232–238.
Kabirifar, K., Mojahtahedi, M., Wang, C., & Tam, V. W. . (2020). Construction and demolition waste management contributing factors coupled with reduce, reuse, and recycle strategies for effective waste management. Journal of Cleaner Production, 263(April). https://doi.org/10.1016/j.jclepro.2020.121265
Lige, F. N., Utiarahman, A., & Tuloli, M. Y. (2023). Evaluasi Metode Lean Construction Dan Penjadwalan Critical Chain Project Management (Studi Kasus Rekonstruksi Jalan Ruas Gorontalo-Biluhu Barat). 3(1), 15–22. https://doi.org/10.37905/jc.v3i1.71
Mandagi, J. V., Nisumanti, S., & Puspita, N. (2022). Evaluasi Kinerja Biaya Dan Waktu Pada Pelaksanaan Pekerjaan Bracing Perkuatan Tiang Pancang Proyek Tol Kapal Betung Paket I Seksi IA. Jurnal Tekno Global, 11(2), 67–71. https://doi.org/10.36982/jtg.v11i2.3051
Munawaroh, F. A., & Sari, O. L. (2022). Analisis Faktor Penyebab Waste Pada Proyek Pembangunan Jalan Tol Balikpapan-Samarinda. Info-Teknik, 23(1), 29. https://doi.org/10.20527/infotek.v23i1.13855
Pamungkas, T. O., Rifai, M., & Soeryodarundino, K. (2024). Penerapan Lean Construction menggunakan Root Cause Analysis dan Metode Borda dalam Mengidentifikasi Waste Non-Value Added Activity (Studi Kasus: Proyek Pembangunan Bendungan Jragung Paket I PT Waskita Karya). And Engineering Journal, 1(2), 1–14. https://journal.pubmedia.id/index.php/civilengineering
Rahmawati, D., Firmawan, F., Auliya, M. B., & Martiano, D. (2021). Analisis dan Evaluasi Sisa Material Kontruksi Menggunakan FTA (Fault Tree Analysis) Studi Kasus: Proyek Pembangunan Gedung ICU RSUD Limpung Kabupaten Batang. 5(2), 115–122. http://journals.usm.ac.id/index.php/jprt/index
Silaban, M. E., & Pamungkas, A. H. (2023). Analisis Waste Material Menggunakan Fault Tree Analysis Pada Pekerjaan Concrete Barrier. Technologic, 14(2). https://doi.org/10.52453/t.v14i2.363
Siregar, A. M., & Kustiani, I. (2019). Contractors’ perception on construction waste management case study in the City of Bandar Lampung. IOP Conference Series: Earth and Environmental Science, 245(1). https://doi.org/10.1088/1755-1315/245/1/012035
Sugiyarto, Hartono, W., & Prakoso, I. T. (2017). Analisis Dan Identifikasi Sisa Material Kontruksi Dalam Proyek Pembangunan Dan Peningkatan Jalan Solo-Gemolong-Geyer Bts Kab. Sragen. Matriks Teknik Sipil, September, 1070–1077.
Suripto, & Susanti, A. R. (2021). Evaluasi Waste dan Implementasi Lean Construction Proyek Gedung Kampus X. Jurnal Riset Dan Invensi Teknologi, 01(02), 65–72.
Susanti, B., Melisah, & Juliantina, I. (2019). Penerapan Konsep Earned Value Pada Proyek Konstruksi Jalan Tol (Studi Kasus Ruas Jalan Tol Kayuagung - Palembang -Betung). Jurnal Rekayasa Sipil (JRS-Unand), 15(1), 12. https://doi.org/10.25077/jrs.15.1.12-20.2019
Downloads
Published
Issue
Section
License
Copyright (c) 2026 Tri Hartono, Mohd. Isneini, Masdar Helmi, C. Niken DWSBU, Vera Agustriana Noorhidana

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.