Optimalisasi Kapasitas Stasiun Kerja dengan Metode Theory of Constraints (TOC) di PT. XYZ

Authors

  • Aditya Paramitha Fakultas Teknik, Program Studi Teknik Industri, Universitas Pembangunan Nasional “Veteran” Jawa Timur
  • Enny Aryanny Fakultas Teknik, Program Studi Teknik Industri, Universitas Pembangunan Nasional “Veteran” Jawa Timur

DOI:

https://doi.org/10.28926/briliant.v9i4.1890

Keywords:

Production Planning, Rough Cut Capacity Planning, Theory of Constraint, Work Station Capacity

Abstract

PT. XYZ is a company that produces rims cars. One of the products produced is rims with ABC type. The production process carried out is make to order repetitive. PT. XYZ has a production capacity problem, causing an unfulfilled order. The production floor has a bottleneck work station at work stations 1 and 2. The accumulation occurs because of the standard time difference and the maximum capacity. This study uses the Theory of Constraints (TOC) method to deal with bottlenecked work stations. Calculating the maximum capacity of each work station results in work station s 1 and 2 having less capacity than the other work station. To solve the bottleneck problem at work stations 1 and 2, there are two alternative solutions, overtime and the addition of a work shift. After analyzing the existing problem, to solve bottlenecks at work station s 1 and 2, add the shift of work from 2 shifts to 3 shifts with an overtime of 1 hour per shift.

References

Ali, M. (2018). Manajemen Industri 4.0 (Pertama). UNY Press.

Dinni, F. (2020). Usulan Penjadwalan Produksi Menggunakan Pendekatan Theory Of Constraints Pada PT. XZY. Jurnal Indonesia Sosial Teknologi, 01(2), 305–322.

Fajrah, N., Laila, W., Alfian, A., Hastarina, M., Wahyudi, B., Pratama, Y. D., Sunarni, T., Nasirly, R., Puji, A. A., Kusmindari, C. D., Harits, D., Arsi, F., Sari, R. K., Budiarto, Do., Afma, V. M., Wardah, S., Melliana, Lawi, A., Setiawan, H., & Zen, Z. H. (2023). Pengantar Teknik Industri. In Angewandte Chemie International Edition, 6(11), 951–952. (Pertama, Vol. 3, Issue 1). Penerbit Widina Media Utama.

Heizer, J., Render, B., & Munson, C. (2017). Operations Management Sustainability and Supply Chain Management. https://ndupress.ndu.

Hidayat, T., Ulum, R. B., & Widarman, A. (2023). Rencanaan Kapasitas Produksi Pupuk Dengan Menggunakan Metode Rough Cut Capacity Planning (Rccp) Pada Pt.Pupuk Kujang. Jurnal Ilmiah Multidisiplin, 2(04), 153–161. https://doi.org/10.56127/jukim.v2i04.816

Mahawati, E., Yuniwati, I., Ferinia, R., Rahayu, P. P., Fani, T., Sari, A. P., Setijaningsih, R. A., Fitriyatinur, Q., Sesilia, A. P., Mayasari, I., Dewi, I. K., & Bahri, S. (2021). Analisis Beban Kerja Dan Produktivitas Kerja. In Yayasan Kita Menulis. Yayasan Kita Menulis.

Novantoro, H., & Singgih, M. (2023). Analisis Beban Kerja Dan Penentuan Jumlah Karyawan Divisi Produksi Dalam Menyelesaikan Target Dari Perusahaan. Jurnal Taguchi: Jurnal Ilmiah …, 632–644. https://taguchi.lppmbinabangsa.id/index.php/home/article/view/116%0Ahttps://taguchi.lppmbinabangsa.id/index.php/home/article/download/116/117

Pede, P. F. A. (2021). Pengaruh Return on Assets Dan Debt To Equity Ratio Terhadap Sustainable Growth Rate Pada Perusahaan Manufaktur Sektor Industri Barang Konsumsi Yang Tercatat Di Bursa Efek Indonesia Tahun 2019. JIMEN Jurnal Inovatif Mahasiswa Manajemen, 1(2), 113–123.

Pradana, A. Y., & Pulansari, F. (2021). Analisis Pengukuran Waktu Kerja Dengan Stopwatch Time Study Untuk Meningkatkan Target Produksi Di Pt. Xyz. Juminten, 2(1), 13–24. https://doi.org/10.33005/juminten.v2i1.217

Prangawayu, N., Anto, F. J. L., & Simangunsong, J. Y. (2021). Analisis Kebutuhan Tenaga Kerja Optimal dengan Metode Work Load Analysis (WLA) pada Extruder Technician I di Departemen Produksi. Seminar Nasional Teknik Dan Manajemen Industri, 1(1), 120–127. https://doi.org/10.28932/sentekmi2021.v1i1.29

Purnomo, H., & Riani, L. P. (2018). Buku Optimasi Pengendalian Persediaan. In Hery Purnomo.

Putra, B. I., & Jakaria, R. B. (2020). Perancangan Sistem Kerja. In A. S. Cahyana (Ed.), Umsida Press. UMSIDA Press. https://doi.org/10.21070/2020/978-623-6081-01-3

Rahayu, M., & Juhara, S. (2020). Pengukuran Waktu Baku Perakitan Pena Dengan Menggunakan Waktu Jam Henti Saat Praktikum Analisa Perancangan Kerja. Unistek, 7(2), 93–97. https://doi.org/10.33592/unistek.v7i2.650

Rahmawati, D., Puryani, & Nursubiyantoro, E. (2019). Optimalisasi Kapasitas Stasiun Kerja Dengan Penerapan Theory of Constraints (Toc). Jurnal Otimasi Sistem Industri, 12(1), 12. https://doi.org/10.31315/opsi.v12i1.2828

Riadi, E., & Suryati, A. (2023). Proses Penjadwalan Jangka Pendek Dengan Theory Constraint Asas Prioritas Bahan dan Alat yang Diproduksi Dalam Kegiatan Operasi Kamar Bedah di Rumah Sakit Umum Pekerja. Bussman Journal: Indonesian Journal of Business and Management, 3(2), 578–587. http://bussman.gapenas-publisher.org/index.php/home/article/view/153/164

Rohman, A. S., & Muhammad, C. R. (2022). Peningkatan Throughput Garmen melalui Perbaikan Stasiun Kerja Bottleneck dengan Theory of Constraint. Jurnal Riset Teknik Industri, 2(2), 99–108. https://doi.org/10.29313/jrti.v2i2.1138

Sekarningsih, P. E., & Hadining, A. F. (2022). Analisis Pengukuran Kerja Dalam Menentukan Waktu Baku Pada Operator Mesin Broaching Dengan Metode Pengukuran Waktu Jam Henti (Studi Kasus: PT XYZ). Jurnal Teknik Industri: Jurnal Hasil Penelitian Dan Karya Ilmiah Dalam Bidang Teknik Industri, 8(2), 175. https://doi.org/10.24014/jti.v8i2.19936

Sproull, B. (2019). Theory Of COnstraints, Lean, and Six Sigma Improvement Methodology Makin the Case for Integration. Routledge/Productivity Press. https://publisher.uthm.edu.my/periodicals/index.php/rmtb/article/view/1993

Sudiantini, D., Irvana, N., Natalia, N., & Furqon, M. (2023). Strategi Penyesuaian Orientasi Pada Industri-Industri Manufaktur Kota Bekasi. Jurnal Ekonomi, Manajemen, Dan Akuntansi, 1. http://jurnal.anfa.co.id/index.php/mufakat

Sugiatna, A. (2021). Analisis Perencanaan Kapasitas Produksi Dengan Menggunakan Metoda Rought Cut Capacity Planning Pendekatan Cpof Di Pt. Xyz. Sistemik : Jurnal Ilmiah Nasional Bidang Ilmu Teknik, 9(02), 28–32. https://doi.org/10.53580/sistemik.v9i02.61

Published

2024-11-30

Issue

Section

Engineering and Technology